Service

The cheapest time to earn a tax exemption is before the concrete pours.

Design decisions determine how much of a new site qualifies under §11.31. We review civil drawings at the design phase — tanks, piping, leak detection, stormwater controls — so qualifying property is documented and maximized from the first tax year.

Drawing review

We identify every qualifying element in your civil set and flag design alternatives that qualify where equivalents do not.

Cost segregation for §11.31

Clean cost basis documentation per asset, ready for the TCEQ application.

Day-one filing

The application is ready when the site opens — no missed first-year savings.

Permits from the start

SWQ permitting handled during construction, so the TCEQ gate is never an issue.

Common questions

When should we engage?

At schematic design or earlier. Once equipment is specified and bought, some qualifying alternatives are off the table.

Enter your address. See your number. Decide in a minute.

You pay only when your exemption is approved.

Get my estimate